Makers Quarter, 15th Street, San Diego
Coastal weatherproofed 10,600 square feet of Dense Glass under custom metal…
Coastal weatherproofed 10,600 square feet of Dense Glass under custom metal…
Coastal sealed concrete walkways and decks using Westcoat MACoat…
Coastal repaired a 90 square foot decorative fountain by removing the failing waterproofing…
Coastal waterproofed poured in place retaining walls at Grossmont High School in La Mesa…
Coastal installed joint sealant to the CMU control joints and then applied…
Coastal waterproofed an 8,000 square foot elevated pedestrian deck of a…
Coastal waterproofed backfilled CMU retaining wall following geoengineer stipulation that water be directed through…
Coastal waterproofed 18,915 square foot parking structure by installing a high…
Coastal installed 8,500 square feet of interior air barrier and 11,500 square feet of…
Coastal painted 26,700 square feet of commercial building façade using Sherwin Williams…