Fountain Waterproofing

Carmel Mountain Ranch Golf Course, San Diego

  • General Contractor

    ML Construction

  • Date Completed

    April 2023

  • Project Type

    Commercial Renovation Project
    Fountain Waterproofing

  • Project Information

    Coastal repaired a 90 square foot decorative fountain by removing the failing waterproofing system and installing CIM 1000 fluid applied membrane waterproofing system. Skimcoat of Sikaquick smooth was applied to fill-in surface voids and holes. We took the necessary steps to properly prepare the concrete surface before installation saving time and money and reducing the possibility of coating failure.