Fountain Waterproofing
Carmel Mountain Ranch Golf Course, San Diego
General Contractor
ML Construction
Date Completed
April 2023
Project Type
Commercial Renovation Project
Fountain WaterproofingProject Information
Coastal repaired a 90 square foot decorative fountain by removing the failing waterproofing system and installing CIM 1000 fluid applied membrane waterproofing system. Skimcoat of Sikaquick smooth was applied to fill-in surface voids and holes. We took the necessary steps to properly prepare the concrete surface before installation saving time and money and reducing the possibility of coating failure.