Urethane Grout Injection

CBRE office building, La Jolla

  • General Contractor

    CBRE

  • Date Completed

    Oct 2024

  • Project Type

    Commercial Renovation Project

    Urethane Grout Injection
    Site Work
    Sealant Waterproofing

  • Project Information

    Coastal CW successfully waterproofed a compromised building in La Jolla with blind application of polyurethane injected grout. A large void at the building column allowed water to enter the building and work its way down to the mechanical room where water collected. From inside the mechanical room, our crew drilled into the floor to reach the joint between the slab and the footing below, installed ports into drilled holes where Aquafin InjectPRO Combi Grout was pumped. Creating a watertight seal.

    Our reputation led to this project after previously working with CBRE on multiple sealing and waterproofing projects in the San Diego area.