Below Grade
Subaru Inventory Lot, National City
General Contractor
First Mark Contracting, Inc.
Date Completed
May 2022
Project Type
New Construction Project
Below Grade WaterproofingProject Information
New Construction Project: Coastal waterproofed backfilled CMU retaining wall following geoengineer stipulation that water be directed through the 2,700 square foot wall into the parking lot so the excess could then flow into storm drains. Using TREMDrain® Total Drain and TREMproof® 250GC, we saved our client time and money with this alternative to traditional French Drains.